Active Alerts

If you are experiencing a water, power, or sewer emergency or service problem call our 24-hour hotline at 3-1-1 or (415) 701-2311 from outside SF or log on at sf311.org. Learn more or review active service alerts.

New SFPUC Water Division Campus

Overview

The San Francisco Public Utilities Commission is starting construction on a new base of operations for its San Francisco Water Division. Located at the intersection of Cesar Chavez Street and Evans Avenue, the SFPUC and its contractor will demolish the existing buildings and construct a new campus with essential facilities for the operations of the SF Water Division. These include an administration building, warehouse, industrial shops and a parking structure. It will be LEED certified with solar arrays that will produce 900 kilowatts of renewable energy to meet the campus’s power needs. The interior courtyard will feature a rainwater garden to capture and divert stormwater.

The seismically resilient facilities will ensure the city is able to provide critical water services for San Francisco residents and for the San Francisco Fire Department during major events and enable Water Division teams to more effectively respond to emergencies such as water main breaks.

Construction Progress - June 2026

Aerial view of campus shows parking garage on left, administration building and warehouse in the center, machine shop on the right, and view of Potrero Hill with downtown city skyline in the background

 

  • Construction Start: January 2025
  • Construction End: End of 2028
  • Project Phase: Construction