Land Engineering Evaluation

The Land Engineering Group (LE) provides engineering evaluation for the use of the SFPUC right of ways (ROW), where water impoundment and transmission facilities are present. LE typically issues the following types of permit work within SFPUC ROW based on property rights.

Consent for Pothole

Potholing is the process of digging up the surface above a pipeline to find the pipeline’s exact depth. Potholing is done prior to a planned installation near or over a SFPUC transmission pipeline. Pothole data is incorporated into the final design of the actual proposed work. LE will typically issue a written Potholing Consent approximately two weeks after receiving the complete information it requires.

Consent for Installation

All projects and activities on the SFPUC’s watershed and ROW lands in San Mateo, Santa Clara and Alameda counties must first be reviewed by the SFPUC’s project review committee.

Once a project has been reviewed, LE handles the Consent for Installation only in ROW where the SFPUC holds easement rights. For proposed installations where the SFPUC owns the ROW in fee, RES is responsible for issuing a lease or revocable license, after LE and other SFPUC divisions complete their respective evaluations.

In public rights-of-way where the SFPUC maintains underground facilities, LE will provide an engineering evaluation of proposed construction. This evaluation assists contractors in making sure their projects proceed smoothly, and at the same time protects SFPUC infrastructure and property. These projects are usually identified as Project Reviewed (PR), to distinguish them from consents that require a Certificate of Insurance.

After Consent, Lease, or License is issued, an applicant is required to submit a certificate of insurance prior to performing any work. Applicants should coordinate with LE Inspector Albert Hao. Contact him by email at AHao@sfwater.org or by phone at (650) 871-3015 for inspection of work throughout the duration of construction.

For Land Engineering Evaluation, please send request to WSTDLandEngineering@sfwater.org.