Water Main Installation

Purpose

To provide specifications and information on installation of ductile iron water mains in the city of San Francisco

Who Must Comply?

All construction projects that include the new installation, relocation, or other modification of a public water main operated by the SFPUC

The City Distribution Division (CDD) Standard Specifications and Plans for Water Main Installation contain the requirements for new low pressure (potable and recycled) water main installations in the city of San Francisco for pipelines smaller than or equal to sixteen (16) inches in diameter. The specifications and plans can be downloaded via the links below.

CDD Standard Specifications for Installation of Ductile Iron Water Mains 16-Inches and Smaller

Full Standard Specifications - January 2020
01 11 00: General Requirements
01 41 28: Protection of Existing Water and AWSS Facilities
01 78 39: Project Record Documents
31 10 00: Water Utility Piping Materials
31 23 36: Excavation and Backfill
32 10 00: Pavement Restoration
33 11 00: Installation of 16-Inch and Smaller Water Mains and Appurtenances
33 11 41: Polyethylene Encasement of Ductile Iron Pipe
33 11 43: Removal of SFWD-Owned Valve Box and Cover 
33 12 13: Installation of Screw Taps, Service Pipe and Fittings
33 13 00: Sanitary Work Practices and Disinfection of Water Utility Distribution

Standard Plan for Ductile Iron Water Main Installation

Full Set - Standard Plans (Revision January 2020)
CDD-LP-001A: Potable/Recycled Water New Main Installation Standard Configuration (1/2)
CDD-LP-001B: Potable/Recycled Water New Main Installation Standard Configuration (2/2)
CDD-LP-002: Potable & Recycled Water Pipe Trench
CDD-LP-003: Air Valves & Blow Offs
CDD-LP-004A: Fire Hydrant
CDD-LP-004B: Hydrant Cap
CDD-LP-005: 4” & 6” Flushing Assembly
CDD-LP-006: Positive Pipe Restraint In Addition To Restraint Gaskets
CDD-LP-008: Installation of Pipe End for SFWD Connection

Connection Plans – New Bypass to Existing Pipe

CDD-LP-101: For New 8" Pipe to Existing 6" or 8" Pipe
CDD-LP-102: For New 12" or 16" Pipe to Existing 6" or 8" Pipe
CDD-LP-103: For New 6" or 8" Pipe to Existing 12" or 16" Pipe
CDD-LP-104: For New 12" or 16" Pipe to Existing 12" Pipe
CDD-LP-105: For New 12" Pipe to Existing 16" Pipe
CDD-LP-106: For New 16" Pipe to Existing 16" Pipe

Connection Plans - New Bypass Tap to Existing Pipe

CDD-LP-107: For New 8" Pipe to Existing 12" or 16" Pipe
CDD-LP-108: For New 12" Pipe to Existing 16" Pipe

Connection Plans – New Bypass to New Pipe

CDD-LP-109: For New 8" Pipe to New 8" Pipe
CDD-LP-110: For New 12" or 16" Pipe to New 8" Pipe
CDD-LP-111: For New 12" or 16" Pipe to New 12" Pipe
CDD-LP-112: For New 16" Pipe to New 16" Pipe

Connection Plans – New Parallel Main Connection

CDD-LP-113: For New 4", 6" or 8" Pipe to Existing 4", 6" or 8" Pipe
CDD-LP-114: For New 6" or 8" Pipe Reducing to Existing 4" or 6" Pipe
CDD-LP-115: For New 12" or 16" Pipe Reducing to Existing 4", 6", 8" or 12" Pipe
CDD-LP-116: For New 12" or 16" Pipe to Existing 12" or 16" Pipe

Connection Plans – New Lateral Main

CDD-LP-117: For New 4", 6" or 8" Branch to New 4", 6" or 8" Main
CDD-LP-118: For New 4", 6", 8" or 12" Branch to New 12" Main
CDD-LP-119: For New 4", 6", 8", 12" or 16" Branch to New 16" Main

Connection Plans – New Lateral Branch to Existing Main

CDD-LP-120: For New 4", 6" or 8" Branch to Existing 4", 6" or 8" Main
CDD-LP-121: For New 4", 6", 8" or 12" Branch to New 12" Main
CDD-LP-122: For New 6", 8" 12" or 16" Branch to Existing 16" Main

Connection Plans – New Lateral Branch Tap to Existing Main

CDD-LP-123: For New 4", 6" or 8" Tap to Existing 6", 8" or 12" Main
CDD-LP-124: For New 6", 8" or 12" Tap to Existing 16" Main

Connection Plans – New Lateral Main to Existing Branch

CDD-LP-125: For New 4", 6" or 8" Main to 4", 6" or 8" Existing Branch
CDD-LP-126: For New 12" Main to Existing 4", 6" or 8" Branch
CDD-LP-127: For New 16" Main to Existing 6" or 8" Branch
CDD-LP-128: For New 12" or 16" Main to Existing 12" Branch
CDD-LP-129: For New 16" Main to Existing 16" Branch

Connection Plans – New Hydrant

CDD-LP-130: For 6" or 8" Pipe
CDD-LP-131: For 12" or 16" Pipe